1/4/2013 Third Well Starts to Produce in the Tubarão Azul Field
OGX has connected and started its third production well in the Tubarão Azul field, TBAZ-1HP, situated in the Campos Basin, on December 31, 2012, which was under cleaning and adjusting process and today initiated the effective oil production.
 
Luiz Carneiro, Chief Executive Officer of OGX says: "We are thrilled that production has started at our third well in the Tubarão Azul Field, which will contribute to increasing OGX’s current production levels".
 
Prior to the beginning of production of TBAZ-1HP well, the FPSO OSX-1 was producing at an average of 10,100 barrels of oil equivalent per day, connected to two production wells, OGX-26HP and OGX-68HP. The TBAZ-1HP well has a horizontal section of 1,200 meters and is located approximately 3 kilometers away from the first two production wells.

Find out more about OGX's first offshore production project.

OGX 2.0

Share this page and page content through social media
 

 Press department contact

 
  • Contatos:

    Daniele Rivera

    +55 (21) 2163-7568

    daniele.rivera@ogx.com.br 

    ​​

The total area of OGX’s 33 exploratory blocks is equivalent to 90% of the surface area of the State of Rio de Janeiro​