1/13/2012 The connection of the FPSO OSX-1 to the turret was concluded
The connection of the FPSO OSX-1 to the turret was concluded on Thursday 12th. The turret interconnects the production unit to the OGX-26 well and to the anchoring system.
 
Follow the latest stages of the production schedule in the company hot sites:
www.ogx.com.br/firstoil and www.osx.com.br/osx-1

OGX 2.0

Share this page and page content through social media
 

 Press department contact

 
  • Insight:
    Tel.: (21) 2509-5399

     

    Contatos:
    Danielle Bastos

The first 30 wells drilled by OGX have a total extension of 138 kms, equivalent to the distance between Rio de Janeiro and Volta Redonda​